Investor · Project Value
- Initial investment
- Project lifecycle
- Maintenance requirements
- Long-term operating impact

Understand your seven surfacing options, evaluate contractors, and choose materials based on the project's users, performance, design, site conditions, and long-term needs.
The same surface should be evaluated differently by the investor, owner, and operator.
Do not begin with “Which EPDM is best?” Open the matching FieldsMaster Solution and compare the decisions required for that application.

Define the intended use, system structure, performance priorities, drainage, and contractor capability.
View This Solution
Review intended users, critical fall-height requirements, applicable testing, system structure, and maintenance.
View This Solution
Ask how drainage, wet-surface use, transitions, cleaning, and installation quality will be managed.
View This Solution
Review drainage, wet-area use, color zoning, transitions, cleaning, and contractor experience.
View This Solution
Balance appearance, comfort, drainage, edges, maintenance, and integration with the surrounding landscape.
View This Solution
Consider walking comfort, route design, drainage, accessibility, maintenance, and long-term site use.
View This Solution
Ask the turf-system provider to define the infill function, specification, quantity, maintenance, and documentation.
View This SolutionUse the proposal and pre-construction meeting to obtain specific answers, not generic assurances.
| Review Area | Question to Ask | Evidence to Request |
|---|---|---|
| Material | What EPDM Granules and PU Binder will be used? | Product specification and sample reference |
| System | What Base Layer, Top Layer, thickness, and structure are proposed? | System drawing and material schedule |
| Technical | What testing or documentation supports the selected application? | Applicable report with product and scope |
| Installation | How will base preparation, mixing, laying, joints, and curing be controlled? | Method statement and site plan |
| Quality Control | How will materials and installation quality be checked? | Inspection and approval records |
| Handover | What documents will be provided after completion? | Certificates, records, checklist, and maintenance guide |
You do not need to become an installer, but you should understand the sequence, layer structure, and approval points.
Ask the contractor to explain the prepared base, Base Layer, EPDM Top Layer, PU Binder, thickness, mixing, installation, curing, and inspection.
The system must be confirmed for the selected application and project specification.

Move through four decision gates before approving material procurement or installation.
Use the complete checklist during contractor review and before final material approval.
Download Project ChecklistUse public FieldsMaster tools and request project-specific documents before making a final selection.
Review EPDM Granules and PU Binder product information.
Review EPDM GranulesCompare published standard colors and prepare a color direction.
Open Color CardCalculate an initial EPDM Granules and PU Binder requirement.
Calculate MaterialsUse published cases to discuss applications and requirements.
View Project CasesRequest Technical Data Sheets, test reports, MSDS, and applicable compliance documents.
Review CertificationShare the application, area, system, destination, and project schedule.
Get Project QuotationTell FieldsMaster what you are building and get practical information to evaluate materials, contractors, and project requirements.