Material Selection
Different EPDM grades, particle sizes, colors, structures, and PU Binder options need to match the application.

From project briefing and material selection to installation guidance and handover preparation, FieldsMaster helps you organize each stage of your EPDM Surfacing project.
Identify the project risks before materials arrive on site.
Different EPDM grades, particle sizes, colors, structures, and PU Binder options need to match the application.
Unclear base, mixing, layer, weather, and curing requirements can increase rework risk.
Unconfirmed colors, samples, and acceptance criteria can cause revisions and delay handover.
Organized installation, inspection, maintenance, and handover records support clearer follow-up.
Use a defined stage structure so decisions, documents, and responsibilities are not left until the installation starts.
Confirm application, system, area, color, schedule, site conditions, material selection, and sample needs. Initial design service can be discussed as a paid service when required.
Prepare the crew with installation guidance, remote technical communication, material records, and organized project tracking.
Prepare applicable product certificates, installation records, acceptance checklist, maintenance guide, and after-sales documentation.
Keep maintenance, follow-up, repeat-order, and future cooperation information connected after project completion.
The installation questions change with the application. Open the corresponding FieldsMaster Solution before finalizing the material and method.

Plan the track type, Base Layer, Top Layer, PU Binder, granule size, drainage, and installation window.
View This Solution
Confirm impact-attenuation requirements, layer structure, color approval, installation zones, and handover records.
View This Solution
Review drainage, wet-area slip considerations, base preparation, color, edges, and curing protection.
View This Solution
Coordinate wet-use requirements, drainage, detailed color zones, installation sequence, and site protection.
View This Solution
Match the design, substrate, edges, drainage, color sample, and installation detail to the residential site.
View This Solution
Review the route, base, drainage, curves, joints, color zoning, construction access, and phased installation.
View This Solution
Confirm the artificial-turf system, infill function, particle specification, quantity, and installation method.
View This SolutionMove from inspiration to a color plan, visual review, material selection, sample confirmation, and installation-ready scheme.
Use FieldsMaster Color System resources to compare colors and create an initial blend before requesting samples.
Inspiration → Color Selection → 3D Visualization → Material Selection → Sample Confirmation → Installation.
Open Color Studio
A number or certificate name is useful only when the applicable document can be reviewed for the selected product and project.
Use the published Color Card to prepare a color direction.
View Color CardRequest the applicable report and verify the tested product and method.
Request Test ReportRequest the relevant report and confirm the tested system and scope.
Review CertificationRequest applicable REACH, PAHs, EN 71-3, ROHS, MSDS, and technical data.
Request Technical DocumentsChoose the resource that supports the next concrete project decision.
Prepare site, materials, method, curing, and inspection discussions.
Download Installation GuideSelect and communicate the color direction before sample approval.
Request Color CardEstimate EPDM Granules and PU Binder quantities from project inputs.
Calculate MaterialsHelp your client understand what was installed, how it was checked, and what information remains available after completion.
Confirm the final answer against the selected product, specification, and site conditions.
Start with the application, proposed structure, particle size, color, site conditions, and relevant technical documents.
Use the FieldsMaster Material Calculator for an initial estimate, then confirm waste, edges, transitions, and site conditions.
Compare binder options against layer position, color requirement, UV exposure, climate, curing conditions, and the technical specification.
Use the Color Card and Color Mixing Tool to prepare an initial direction before sample confirmation.
A sample request can be used to review color and material before a bulk order is confirmed.
Request the reports and technical documents relevant to the selected product and application, then verify their scope.
Share the application, area, system, colors, site conditions, destination, and schedule for a practical project review.